Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Hebei Huamei Gray Insulation Building Materials Co., Ltd.

The company has strong technical force, modern production equipment, scientif...

sell
  • There is no classification
contact
  • Contact:王洪涛
  • Phone:0316-7701007
  • Email:hmgrbw2014@126.com
  • fax:0316-7701007
search
 
link
  • There is no link yet
home > sell > Exterior wall insulation extruded board cold storage special extruded board
Exterior wall insulation extruded board cold storage special extruded board
products: Views:8Exterior wall insulation extruded board cold storage special extruded board 
brand: 华美
price: 570.00元/普通
MOQ:
Total supply: 1 普通
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2016-03-21 14:10
 
Details
The difference between ordinary board and flame-retardant board is whether there is flame retardant added, and the weight is slightly lighter: flame-retardant board is more than 3 kilograms per square, and ordinary board is only about kilograms. "The price of flame retardants is very high, so the cost of flame retardant boards has also increased significantly." The flame retardant effect of ordinary boards without flame retardants is not good, and it can even be said that the flame retardant rate is zero. The price of this kind of board is relatively cheap. It is 3 yuan per cubic meter and has various specifications, from centimeter to centimeter, etc., and its prices are different. Flame-retardant boards are divided into B and B grades. For details, see (Old Standard). Flame-retardant boards have high production technology requirements and good flame-retardant effects. They can effectively ensure construction safety and reduce project risks and losses. Therefore, the Ministry of Construction and the Ministry of Public Security A joint document stipulates that walls with non-fire-retardant panels are prohibited. Because the project cost will increase, many project construction methods take risks, which makes the project safety problem very serious. Sales Phone 3 Manager Wang
Request for quotation
A total of0articles  Related Comments: